Case Study: American Case Iron Pipe Company

Industrial Ventilation Solution AMERICAN Cast Iron Pipe Company turned to IVI for an industrial ventilation solution to improve the environment surrounding its operators at the pipe casting machines. The Problem Production inefficiency through heat and humidity High heat and humidity in the foundry made for a difficult and unsafe work environment and created equipment issues…

Case Study: Grede Reedsburg

Custom Baghouse Dust Collector IVI’s customized baghouse dust collector provided Grede Reedsburg with a cleaner work environment and reduced delays from system clogging. The Problem Baghouse showing wear Grede Reedsburg’s baghouse system was showing wear in the down flow collector’s head sheet side walls. Water was infiltrating into the dust flow, occasionally plugging and the system and causing…